View Procedure
| Procedure Name | EIE - Environmental Permit |
| Description |
| EIE – ENVIRONMENTAL PERMIT |
|
RESPONSIBLE AGENCY
National Environment Office
Address:
Antaninarenina
Contact: Ms. Manohizosoa RAKOTONIRINA
e-mail: manoa@pnae.mg
Site web : www.pnae.mg
| ESTIMATED LEGAL TIME OF THE PROCEDURE |
VALIDITY |
|
3 working days
|
N/A |
COSTS
| DESCRIPTION |
VALUE |
| Assessment Fees |
5% of the investment value |
REQUIRED DOCUMENTS
|
Description
|
Qty
|
|
Files to provide
|
|
A letter requesting an environmental assessment from the promoter addressed to the Director General of ONE,
|
1
|
|
EIA/MEC report in seven (07) copies + an electronic version,
|
1
|
|
Non-technical summary of the report in Malagasy in seven (07) copies,
|
1
|
|
Non-technical summary of the report in French in seven (07) copies,
|
1
|
|
All supporting documents for the amount of the planned material investment, certified by the Ministry responsible for the project,
|
1
|
|
Receipt for payment of the promoter's (investor's) contribution to environmental assessment and monitoring costs to be paid to:
BFV SG Antaninarenina
Special Evaluation Account
Account No.:
on account in Ar no. 05 004 000 217/ Key 56
Bank Code 00008 - Agency Code 00005
Method of payment:
either by crossed check made out to the National Office for the Environment
or by bank transfer (with delivery of the copy of the transfer to the ONE)
|
1
|
|
|
WORK STEPS
Step 1: Examination of admissibility
Step 2: Environmental assessment
Step 3: Public hearing
Step 4: Development of the Environmental Specifications
Step 5: Issuance of the environmental permit
|
|
|
PROCESS MAP

|
|
|
| Category | Producing |
The following form/s are used in this procedure
This procedure applies to the following measures
| Name | Measure Type | Agency | Description | Comments | Legal Document | Validity To | Measure Class |
| No results found. |